Paused · supplier-quote-ready + DFM-ready
Multi-Variant Mechanical Platform and Supplier Readiness
Four related manual-adjustment products needed shared mechanisms and supplier definition without allowing common parts, purchased components, or assumptions to conceal variant risk.
- 01312-row controlled BOM
- 02199 purchased components
- 03Variant requirements
- 04CTQ + first-article gates
- 05Supplier RFQ controls
My role
Architecture, requirements, shared interfaces, BOM strategy, CTQs, first-article planning, supplier RFQ controls, and validation gates.
Engineering actions
- Developed manual hand-crank and handwheel architecture with guarded access.
- Separated shared requirements and interfaces from variant-specific definition.
- Structured a 312-row BOM including 199 purchasable or COTS lines.
- Established CTQs, first-article and test matrices, supplier questionnaires, quotation templates, and deviation tracking.
Outputs
- Architecture record
- Variant requirements
- BOM strategy
- CTQ and inspection definitions
- Supplier RFQ controls
What this record proves
The publication-cleared record supports architecture, sourcing, CTQ, inspection, and quotation readiness. The program was not fabrication-release-ready; final native CAD, released drawings, toleranced interfaces, CAD-derived BOM reconciliation, and validation closure remain.








